Greenheart Sustainable Construction
  • Home
  • What We Do
  • Projects
  • Team
  • News
  • Contact

Latest news from Greenheart

No Gas? No problem! Greenheart respond to Committee On Climate Change UK Housing report

22/2/2019

0 Comments

 
Picture
Urgent Government intervention is required and the construction industry must remove its head from the sand - our to Committee On Climate Change UK Housing report
 
For those of us promoting sustainable building for decades, the recently published Committee On Climate Change (CCC) report UK Housing: Fit For The Future? says nothing new.  The report is hardly as radical as some suggest - it describes what we at Greenheart Sustainable Construction are doing right now, and have done for nearly two decades.
 
There is clear demand for this type of building approach, and we suggest it is time the Government and the industry moved into the 21st century and took this seriously.
 
Greenheart Sustainable Construction have been building gas-free, low-energy, timber frame, super-insulated homes for some time now.  Since 2000, we have built above and beyond the current regulations, researching and implementing new and progressive construction methods and technologies. The knowledge and products are available - Air Source Heat Pumps (ASHP) and Solar PV to induction hobs and LED lighting - but remains a small niche part of the wider industry, which is sadly resistant to change.
 
Government funding and intervention is urgently required.  Without this, the industry will continue to build to a level that struggles to meet current regulations - let alone building for a sustainable future.  We suggest:
​
  1. Setting standards for building regs with clear steps over the next few years.
  2. Effective building regulations enforcement for all housing
  3. Setting industry minimum qualifications and experience
  4. Funding proper training and enforce CPD type ongoing training.
  5. Grants for PV and ASHP to help boost the take up of these technologies
  6. Better promotion of timber frame construction – the UK lag miles behind Europe and the US on this.
 
The building sector itself must also take greater responsibility for the performance gap.  A more regulated, professional, educated workforce is desperately needed. We at Greenheart, along with pioneering training organisation The Green Register, are currently promoting such education for construction professionals.
 
An enormous cultural shift is required but without this the words in the CCC report will come to nothing. If we all play our part we can construct a greener future.

Picture
Grove End eco home in Gloucestershire - built by Greenheart to Passivhaus standard with ASHP, MVHR, PV, Solar Thermal, Tesla battery, wood burner for occasional boost in heating.
0 Comments

    Greenheart News

    ​​Sustainable Design & Build in Bristol and Bath, specialising in Passive House construction

    Archives

    December 2022
    November 2022
    September 2022
    April 2022
    March 2022
    January 2022
    November 2019
    June 2019
    May 2019
    March 2019
    February 2019
    January 2019
    December 2018
    November 2018
    September 2018
    August 2018
    July 2018
    May 2018
    April 2018
    March 2018
    February 2018
    January 2018
    December 2017
    November 2017
    October 2017
    August 2017
    July 2017
    June 2017
    May 2017
    January 2017

    Categories

    All
    Airtest
    Airtightness
    Architect
    Backwell
    Bath
    Bristol
    Bristol 247
    British Cedar
    British Wood
    Builder
    Building
    Church Road
    Cladding
    Colerne
    Comment
    Committee On Climate Change
    Construction
    Construction Industry
    Construction Site
    Deep Green Retrofit
    Design & Build
    Design & Build Bristol
    Eco Architect
    Ecobuilding
    Eco Building
    Eco Design
    Eco Home
    Eco Homes
    Eco House
    Emmett Russell Architects
    Enerphit
    Events
    Extension
    Film
    Fit For The Future
    Four Walls
    Green Architecture
    Green Building
    Green Building Training
    Greenheart
    Greenheart Team
    Green Home
    Green Roof
    Hill House
    House Extension
    Ian Mawditt
    Insulation
    Interview
    Media
    MVHR
    Nailsea
    National Self Build And Renovation Centre
    New Build
    New Project
    NSBRC
    Passive House
    Passivhaus
    PHPP
    Piers Sadler
    Podcast
    Press
    Project Manager
    Project Update
    PV
    Rebuild
    Refurbishment
    Renewables
    Retrofit
    Roofing
    Second Fix
    Sedum
    Sedum Roof
    Self Build
    Site Update
    Site Visit
    Solarsense
    Somerset
    Sustainable Building
    Sustainable Construction
    Sustainable Design
    Sustainable Living
    Team
    TESLA
    The Green Building Store
    The Green Register
    The Property Voice
    Timber
    Timber Conference
    Timber Frame
    Timber Framing
    UK Housing Report
    Underfloor Heating
    Vastern
    Warmcel
    Wiltshire
    Youtube

    RSS Feed

Greenheart Sustainable Construction
Studio 2, St Andrew's Road, Montpelier, Bristol, BS6 5EH
info@greenheartuk.com 
0117 942 9717
The Green Register
Passivhaus Trust
AECB
  • Home
  • What We Do
  • Projects
  • Team
  • News
  • Contact